The Special Treat Project

The project aims at significantly improving the living conditions of 300,000 people in and environment of the Municipal Assemblies (MAs) of Nsawam-Aodoagyiri, Ga Central and Ga West. This by treating approximately 50% of the estimated annual faecal sludge generation in these MAs.

The project installs six 30-seater sanitation blocks (plus 4 after the project duration) and 3 Waste Water Treatment Plants (WWTP) at the project locations. At the WWTPs, production facilities for biogas and fertilizer will also be established.

Project summary

Project number:
NL-KVK-27378529-GWW1505
Total budget:
€ 3,058,617
Countries:
Ghana
Project status:
Finalised
Budget spent:
100.00 %
100.00 % spent
Tied status:
Partially tied
Startdate:
Enddate:
Contact:
iati@rvo.nl
Project partners:
GIELING CONSULTANCY B.V., Ga Central Municipal Assembly, Ga West Municipal Assembly, Institute for Environmental & Sanitation Studies, MDF Global B.V., Netherlands Enterprise Agency, Nsawam-Adoagyiri Municipal Assembly
Sectors:
Basic sanitation, Waste management/disposal