Bangladesh goes Fresh
Short general project overview
In the coastal zone of Bangladesh, available water sources are either prone to contamination (surface water/ponds) or salinization (groundwater). Fresh groundwater is only present in specific locations and depths, depending on the geological setting. It is therefore of paramount importance to determine these locations in order to provide the population with safe drinking water. To extract fresh water from the subsurface, tube-wells are drilled, up to sometimes hunderds of meters. To increase the success-rate of these drillings, it is important to identify zones of potential productive drillings.
The project aims to analyse if it is feasible to map fresh groundwater from the air in the coastal zone of Bangladesh. The technique comprises a measuring device that is towed under a helicopter which detects the electrical conductivity of the subsurface with depths down to 300 m. Conductivity and groundwater salinity are closely linked and, therefore, measuring conductivity offers a good way to map the occurrence of fresh (or saline) groundwater. By mapping through a helicopter with survey equipment, flying in lines over the survey area, a 20 x 20 km survey can be flown in roughly four to five days. This is a fast and cost effective way of mapping salinity in groundwater.
This feasibility study will benefit the Department of Public Health Engineering (DPHE), which is responsible for delivering drinking water in Bangladesh. DHPE also provides support to the local government institutions in the development of operation and maintenance of water & sanitation facilities. The feasibility study will address issues that are relevant to carry out a possible next phase: a pilot-area (20 km x 20 km) south of Khulna.
Initial activities and results of the project
- Work with DPHE on exploring a methodology for efficiently using the airborne data and information from the potential survey and integrating this information into groundwater management and the selection of tube well locations.
- Discussions with financing institutions on the financing of a large scale mapping project. The project partner(s) will explore the possibilities of a business case for a large scale mapping project.
- Partners will investigate existing data that can be used to supplement/support the selection of a suitable pilot area.
- A meeting will be held with the Bangladesh Ministry of Defence to discuss obtaining flying permits and possibilities for gaining access to landing areas.
- The partners will start searching for suitable helicopter operators within reasonable proximity of the survey area which are able to fly the survey to the standards recommended by the company supplying the survey technology.
- The partners will request information on survey parameters and flying requirements from geophysical survey companies and with this in mind will design a survey-plan for the pilot area.
- The partners will undertake a field study to collect all necessary information for a logistical plan such as survey hazards, infrastructure, emergency rescue coordination centres and medical facilities.
- The partners will design a detailed implementation plan for the pilot project including the costs and SWOT analysis, necessary resources, etc.
The feasibility study will generate the following results:
- A list of possible financing options for a large scale mapping project across the coastal zone of Bangladesh in case the foreseen pilot project proves to be feasible.
- DPHE to have a proposed methodology to use the mapping results to indicate locations for future tube wells, to assess the impact of current tube wells and assure sustainable groundwater use that is based on detailed spatial data and information in three dimensions.
- Detailed overview of the logistics, costs, risks and technical aspects of the pilot project and large-scale project.
- Logistical plan for the pilot project which will include permits, flying schedule, public notice, survey hazards, infrastructure, local helicopter operator, emergency rescue coordination centres, medical facilities.
- Initiative to a proposal on fruitful governance structures for drinking water distribution in relatively remote but still densely populated parts of Bangladesh that are on the one hand embedded in the central Bangladesh Delta Programme and on the other hand take care of operational management needs at local level.
What makes the technology, product, method or approach used innovative?
In developing countries, the airborne survey for electrical conductivity of the subsurface has not been used (except for small parts of India), while the potential for this method is enormous. The method offers a fast and reliable way to determine scarce fresh groundwater reserves.

Project number
NL-KVK-27378529-PVW4S18014Total budget
€ 71,388Countries
BangladeshProject status
FinalisedBudget spent
Programme
Partners for Water (PVW4) 2016 - 2021Tied status
UntiedContact
iati@rvo.nlProject partners
Acacia Water B.V., Nederlandse Organisatie voor toegepast-natuurwetenschappelijk onderzoek TNO, Netherlands Enterprise AgencySectors
Water resources conservation (including data collection)| Type | Provider | Provider ref. | Receiver | Receiver ref. | Value (€) | Date | Value date |
|---|---|---|---|---|---|---|---|
| Incoming Funds | 71,631.00 | 06-06-2018 | 06-06-2018 | ||||
| Incoming Funds | -243.00 | 15-10-2019 | 15-10-2019 | ||||
| Outgoing Commitment | Nederlandse Organisatie voor Toegepast-Natuurwetenschappelijk Onderzoek TNO | 71,631.00 | 06-06-2018 | 06-06-2018 | |||
| Outgoing Commitment | Nederlandse Organisatie voor Toegepast-Natuurwetenschappelijk Onderzoek TNO | -243.00 | 15-10-2019 | 15-10-2019 | |||
| Disbursement | Nederlandse Organisatie voor Toegepast-Natuurwetenschappelijk Onderzoek TNO | 32,300.00 | 07-06-2018 | 07-06-2018 | |||
| Disbursement | Nederlandse Organisatie voor Toegepast-Natuurwetenschappelijk Onderzoek TNO | 32,168.00 | 13-07-2018 | 13-07-2018 | |||
| Disbursement | Nederlandse Organisatie voor Toegepast-Natuurwetenschappelijk Onderzoek TNO | 6,920.00 | 16-10-2019 | 16-10-2019 |